Photos from: Drills confirming zinc at Pine Point




Pine Point Mining Ltd.

Hole W85-17-DBL-001 cut 50.5 meters averaging 9.03 percent zinc, 4.1 percent lead, 16.9 grams per metric ton germanium and 4.4 g/t gallium at the W85 deposit at Pine Point.



Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024