Home Classifieds Directory Store About Contact Advertise
Free Trial Subscribe Sign In
Shane Lasley
This core is from a 4.5-meter section of skarn mineralization drilled into the Main Peak Gold deposit in 2012 that averaged 68 g/t gold, 10 g/t silver and 0.36 percent copper.