Home Classifieds Directory Store About Contact Advertise
Free Trial Subscribe Sign In
Shane Lasley
A 400-pound composite sample of 2021 drill core averaging 11.85 g/t gold, 6.2 g/t silver, 0.52% copper, 5.13% zinc, and 1.27% lead was used for the JT deposit metallurgical program.