Expanding Mispickel; TerraX adds second rig

 

Last updated 8/28/2016 at Noon



TerraX Minerals Inc. Aug. 23 reported the addition of a second drill to its 27,000-meter drill program at the Yellowknife City Gold project in the Northwest Territories.

The drill program, which began in July and is slated to run through 2017, began with one drill at the Mispickel target.

Discovery drilling at Mispickel, completed during the winter of 2016, cut 8.6 meters averaging 12.87 grams per metric ton gold and 7.3 meters of 23.6 gold; follow-up drilling cut eight meters averaging 60.6 g/t gold.

One drill remains focused on expanding Mispickel, while the second rig will drill aggressive step-out holes along other sub-parallel mineralized structures at Mispickel identified by surface mapping and sampling.

Having recently completed a C$7.5 Million funding, TerraX said it currently has roughly C$11.7 million in cash and is fully funded through the balance of this program.

Author Bio

Shane Lasley, Publisher

Author photo

Over his more than 16 years of covering mining and mineral exploration, Shane has become renowned for his ability to report on the sector in a way that is technically sound enough to inform industry insiders while being easy to understand by a wider audience.

 

Reader Comments(0)

 
 

Our Family of Publications Includes:

Mining News
Metal Tech News

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024