IDM Mining reinforces Red Mountain resource

 

Last updated 2/3/2018 at 8:55pm



IDM Mining Ltd. Nov. 1 posted results from another 10 underground holes drilled during the phase-1 exploration program at its Red Mountain gold project near Stewart, British Columbia.

U16-1194, drilled in the AV zone, cut 23.13 meters grading 5.81 grams per metric ton gold and 16.11 g/t silver; U16-1202, drilled in the JW zone, cut 17.81 meters of 6.45 g/t gold and 60.7 g/t silver; and U16-1205, drilled in the Marc zone, cut 8 meters of 20.29 g/t gold and 68.74 g/t silver.

The information from these infill and metallurgical holes will inform an upcoming feasibility study.

"These results confirm the substantial widths and robust grades at Red Mountain," said IDM Mining President and CEO Robert McLeod. "Our underground drill crews at Red Mountain are currently wrapping up the final resource expansion holes from the 2016 program, with additional assay results to be announced through the remainder of the year, including surface drilling from Lost Valley, 141 and Brad zones."

-SHANE LASLEY

 

Reader Comments(0)

 
 

Our Family of Publications Includes:

Mining News
Metal Tech News

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024