Author photo

By Shane Lasley
Mining News 

Strong 2023 start for Eagle Gold Mine

First quarter gold output jumps 55% at Victoria's Yukon mine North of 60 Mining News – April 7, 2023

 

Last updated 4/13/2023 at 6:25pm

Heap leach solution pipes and ore being stacked on a snow-covered pad at Eagle.

Victoria Gold Corp.

Victoria Gold stacked 2.1 million metric tons of ore averaging 0.86 g/t gold on the Eagle Mine heap leach pad during the first quarter, which is expected to jump-start 2023 gold production at this Yukon operation.

Victoria Gold Corp. April 5 announced that it produced 37,619 ounces of gold during the first quarter of 2023 operations at its Eagle Mine in the Yukon, a nearly 55% increase over the 24,358 oz produced during the first three months of last year.

"This was the best Q1 performance for the Eagle Gold Mine since operations commenced with strong gold production and ore tonnage stacked on the heap l...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024