ClassifiedsDirectoryStoreAboutContactAdvertise
Free TrialSubscribeSign In
Shane Lasley
Core from a 4.5-meter section of skarn mineralization encountered during 2012 drilling at the Main Peak Gold deposit that averaged 68 grams per metric ton gold, 10 g/t silver and 0.36 percent copper.