Photos from: Strong 2023 start for Eagle Gold Mine




Victoria Gold Corp.

Victoria Gold stacked 2.1 million metric tons of ore averaging 0.86 g/t gold on the Eagle Mine heap leach pad during the first quarter, which is expected to jump-start 2023 gold production at this Yukon operation.



Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024