Seabridge trims 2015 exploration program
Last updated 8/2/2015 at Noon
Seabridge Gold Inc. July 28 said initial results from the 2015 core drilling program at its KSM project in northwestern British Columbia points towards a sizeable expansion of the Mitchell deposit at depth, but further evaluation is needed prior to additional drilling.
M-15-130, the first hole of the program, cut 174 meters of 0.55 grams per metric ton gold and 0.28 percent copper and M-15-131, dr...
For access to this article please
sign in or
subscribe.
Reader Comments(0)