TerraX finishes Yellowknife winter drilling
North of 60 Mining News – May 11, 2018
Last updated 9/25/2020 at 4:51am
TerraX Minerals Inc. May 8 said it completed 5,684 meters of winter drilling at its Yellowknife City Gold project, including four holes that extended the high-grade Crestaurum gold bearing structure to a depth of 300 meters.
The 187 previously drilled holes Crestaurum had traced the structure along 1,400 meters of strike length and to a depth of roughly 150 meters, outlining a deposit with grad...
For access to this article please
sign in or
subscribe.
Reader Comments(0)